4,000m² Tonnes of IKO Permapark Waterproofing System

Project Description
Approached by Caces Consulting to provide a solution to strip and replace failed asphalt coverings. The store was having a full refurbishment by Marks and Spencer as it had recently had a change of ownership. Along with the fast turn-around time, IKO Permapark Mastic Asphalt was chosen because it offers a minimum of 20 year warranty, giving a fantastic return for the lifespan of the product. This was the only system that could guarantee that the project would be completed on time and on budget given the unknown condition of the existing deck.

Also the ever green features of mastic asphalt meant that the existing asphalt coverings where able to be stripped and removed from site, however rather than going to land fill the old coverings were transported back to the IKO factory at Grangemill to be fully recycled for use within the IKO Permascreed products.